Get in Touch
Blog Center
  1. Home >
  2. Blog >
  3. ball mill >
  4. Blog Detail

Copper Ore North Mine Plant Design Images

2 Mineral reserves and resources are estimated using a minimum NSR cutoff of C105 per tonne for waste filled mining areas and a minimum of C116 per tonne for paste filled mining areas 3 Metal prices of 110 per pound zinc 1500 per ounce gold 310 per pound copper and 1800 per ounce silver with an exchange rate of 130 CUS were

Blog Show

Relate Blog

CONTACT US

Are You Looking for A Consultant?

toTop